Paragon 360 Completes Renovations for First Baptist Church, Owensboro, Kentucky

by | Audio, AVL Projects, Case Studies, Facilities, Lighting, Production, Video

First Baptist Owensboro, KY contracted with Paragon 360 for a full-scope renovation project in early January 2023. The main goals were to update the experience in the main sanctuary while maintaining the architectural beauty and improve the online experience. A desire for better connection to the lobby and an overall improved first-time guest experience were also a the top of the list. Paragon enlisted their architectural design partner, Torgerson Design Partners (TDP) for the architectural work. This was only the second renovation of the 100-year-old worship center. Paragon was able to maintain the existing pneumatic organ chambers and pipes and incorporated them into the design.  

AUDIO, VIDEO & LIGHTING
Paragon designed and installed new Audio systems that included a NEXO loudspeaker system with Fulcrum subs and JBL front fills. Mixing and personal monitoring was done was done through Allen & Heath. The system included hearing assist systems, wireless IEM’s, custom equipment racks and Paragon’s signature choir monitor system which greatly improved the choir experience.

The video system included (2) new Revelux StoryGlass LED walls with custom surrounds. Also included were new robotic cameras and various production equipment which was part of many improvements and an enlargement of the existing video production booth. The system also included a distributed, digital signage system. Audio for video included another Allen & Heath console and JBL monitoring, separating the online mix from the FOH mix.

The platform LED lighting system included new Chauvet Ovation fixtures with lighting control via a High End Systems Hedge Hog console in addition to ETC relay panels and architectural control button stations. Several new motorized lighting positions were created using standard truss and CM loadstar motors with cable management via Pantograph systems. Custom scenic and architectural elements contained LED lighting by Environmental Lighting. In addition, LED house lighting was designed and installed using Pathway Lighting products.

CUSTOM ARCHITECTURAL ELEMENTS
Paragon’s design team provided interior design for the project and created modifications to the main platform in an effort to provide more usable space within the existing footprint. The project also included Paragon’s signature, custom, illuminated scenic and architectural elements that were used to help modernize the look of the platform and tie elements from the back wall into the main platform. Paragon designed and built custom back wall baptistery surrounds, a Halo lit wooden cross, modesty walls, a front of stage façade and a custom drum enclosure.

ACOUSTICS & SEATING
Paragon also designed and provided acoustical solutions for the space following a comprehensive audio and acoustical analysis that was completed during the design process. As a result, over 4,000 square foot of acoustical material and Fabri-TRAK were installed on the side and back walls above and below the balcony and on the balcony face. The project also included all new seating by Sauder throughout the space. Pews were removed and replaced with individual Sauder Vista theatre seats with pew end caps to help maintain the classic feel in the space. Paragon worked in unison with TDP and Sauder to redesign the entire platform riser system for safety and comfort.”Our experience working with Paragon was absolutely amazing,” said Bob Farmer, Business Administrator for FBC Owensboro. “We were a team.”

For more details, see the project profile here.

About Paragon 360

Paragon 360® is an award-winning design leader in the house of worship space. Our signature design-build approach, developed specifically for the house of worship market, saves significant time and money while increasing coordination and accountability. We bring value to vision. We are the “name trusted more” by hundreds of churches nationwide. Paragon 360® is the oldest and largest in a family of companies that come together to provide its turnkey, design-build service offering. Those other companies include Paragon Fabrication, Xperience Construction and Colligo Holdings.

Sign Up for the Worship Facility Newsletter!

NEW THIS WEEK

Worship Facility Podcast: Leadership and Tech Teams

David Leuschner talks to Nicole Lucas, author of "Leadership Frameworks" about how leadership skills, social skills, and emotional intelligence apply to leading a tech team.Other topics include: What to do with your used production gear What churches need to do to...

Intro to House of Worship Production with Vectorworks

As houses of worship embrace modern technology to enhance their services, the demand for production tools is increasing.  This article covers, first, what’s meant by “house of worship production” and “church production,” and then explores how Vectorworks can...

Green Hippo Previews Hippotizer MX Series at LDI 2024

Green Hippo, an industry leader in media manipulation and 3D mapping, was thrilled to preview its new Hippotizer MX Series with ACT Entertainment at Live Design International 2024. The Hippotizer MX Series offers five new customizable, dependable, and future-proofed...

Deadly Shooting at Abundant Life Christian School in Wisconsin

How Should Christian Schools Respond to the Threat of Gun Violence? Only three weeks ago, I was sitting in the head of school's office at a private Christian school in Minnesota discussing gun violence and their response to such a threat. There were three real options...

7 Key Security Trends Churches Should Prioritize in 2025

As we step into 2025, church safety and security leaders face an ever-evolving landscape of challenges and opportunities. From technological advancements to addressing the rising tensions in society, this year brings a renewed focus on critical areas of improvement....